Radar Rail Emergency Stop Ordering

Purpose

Ensure emergency shutdown disables risky outputs in an explicit order and leaves diagnostic state for recovery. This workflow turns the concern into a traceable engineering contract for the AERIS-10 project, while keeping simulations, software behavior, and physical measurements clearly distinguished.

Required inputs

Inspect Power control, amplifier enable lines, RF switch control, and failure-state handler. Gather the authoritative interface/schema, the selected board or bitstream revision, existing tests, and the expected result. Prefer synthetic input vectors, simulator outputs, host mocks, and de-energized design inspection.

Workflow

  1. Trace Power control, amplifier enable lines, RF switch control, and failure-state handler and record source paths, board/design revision, input/output ownership, and the existing validation entry points.
  2. Define pass/fail invariants for ensure emergency shutdown disables risky outputs in an explicit order and leaves diagnostic state for recovery.; explicitly document units, widths, timing assumptions, safe defaults, and unsupported states where relevant.
  3. Exercise Over-temperature, watchdog timeout, lost communication, and repeated stop request with deterministic simulation or mocked hardware. Include normal, boundary, malformed, reset/cancellation, and failure cases without relying on uncontrolled physical targets.
  4. Produce A shutdown sequence contract and test traces. Run the narrow test and relevant regression suite, capture actual outputs, and separate verified findings from assumptions requiring qualified hardware review.

Validation checklist

  • The requirement is represented as an explicit, repeatable assertion or review criterion.
  • Boundary values and at least one injected failure are included.
  • Units, revision, data origin, and interface timing are stated where they change interpretation.
  • Test results cite the exact command/tool run and repository revision.
  • Simulation/mock evidence is not misrepresented as hardware measurement or certification.
  • RF, power, motion, or external-interface tests stop when the approved safety envelope is unknown or violated.

Required output

Deliver A shutdown sequence contract and test traces. Attach the paths reviewed, fixture or simulation identifiers, test commands and observed results, unresolved safety/compliance questions, and a clear distinction between code-level evidence and physical verification still required.

Boundaries and failure handling

Use synthetic inputs, host tests, simulation, or de-energized inspection wherever possible. Physical RF or powered hardware work requires qualified supervision, an approved lab procedure, regional compliance review, and functioning safety/thermal interlocks. Do not bypass an interlock, increase transmitter power or range as an objective, or turn signal-processing workflows into instructions for targeting people. If the design revision, emissions permission, termination, cooling, or measurement setup is uncertain, stop and document the blocker.

Trigger examples

  • Positive: A maintainer needs to ensure emergency shutdown disables risky outputs in an explicit order and leaves diagnostic state for recovery..
  • Negative: Bypassing emergency shutdown because it interferes with a test.