"Apply deterministic engineering checks to keep RTL command and opcode values aligned with the authoritative top-level contract and all dependent interfaces."
Install
npx skillscat add lucas-belucci-bellini/all-skills-for-the-claude-code/radar-rtl-opcode-source-of-truth Install via the SkillsCat registry.
Radar RTL Opcode Source Of Truth
Purpose
Keep RTL command and opcode values aligned with the authoritative top-level contract and all dependent interfaces. This workflow turns the concern into a traceable engineering contract for the AERIS-10 project, while keeping simulations, software behavior, and physical measurements clearly distinguished.
Required inputs
Inspect 9_Firmware/9_2_FPGA RTL definitions and related STM32 command enums. Gather the authoritative interface/schema, the selected board or bitstream revision, existing tests, and the expected result. Prefer synthetic input vectors, simulator outputs, host mocks, and de-energized design inspection.
Workflow
- Trace 9_Firmware/9_2_FPGA RTL definitions and related STM32 command enums and record source paths, board/design revision, input/output ownership, and the existing validation entry points.
- Define pass/fail invariants for keep rtl command and opcode values aligned with the authoritative top-level contract and all dependent interfaces.; explicitly document units, widths, timing assumptions, safe defaults, and unsupported states where relevant.
- Exercise Missing opcode, width mismatch, duplicate value, reserved value, and host/FPGA revision skew with deterministic simulation or mocked hardware. Include normal, boundary, malformed, reset/cancellation, and failure cases without relying on uncontrolled physical targets.
- Produce An opcode/width table with cross-layer tests. Run the narrow test and relevant regression suite, capture actual outputs, and separate verified findings from assumptions requiring qualified hardware review.
Validation checklist
- The requirement is represented as an explicit, repeatable assertion or review criterion.
- Boundary values and at least one injected failure are included.
- Units, revision, data origin, and interface timing are stated where they change interpretation.
- Test results cite the exact command/tool run and repository revision.
- Simulation/mock evidence is not misrepresented as hardware measurement or certification.
- RF, power, motion, or external-interface tests stop when the approved safety envelope is unknown or violated.
Required output
Deliver An opcode/width table with cross-layer tests. Attach the paths reviewed, fixture or simulation identifiers, test commands and observed results, unresolved safety/compliance questions, and a clear distinction between code-level evidence and physical verification still required.
Boundaries and failure handling
Use synthetic inputs, host tests, simulation, or de-energized inspection wherever possible. Physical RF or powered hardware work requires qualified supervision, an approved lab procedure, regional compliance review, and functioning safety/thermal interlocks. Do not bypass an interlock, increase transmitter power or range as an objective, or turn signal-processing workflows into instructions for targeting people. If the design revision, emissions permission, termination, cooling, or measurement setup is uncertain, stop and document the blocker.
Trigger examples
- Positive: A maintainer needs to keep RTL command and opcode values aligned with the authoritative top-level contract and all dependent interfaces..
- Negative: Changing protocol numbers without interface review or testing against controlled fixtures.