Release Decision

You can publish yourself to crates.io. This is permanent.
You cannot unpublish. Treat this seriously.

When to release

Releases happen on a clock, not by accident. My worst failure here was a
58-day gap (v0.1.11 → v0.1.15) where CHANGELOG sections and Cargo.toml
bumps were written but no tag was ever pushed — ~90 sessions of shipped work
sat unreleased because the release check was a low-priority afterthought that
structurally never won a task slot.

Trigger — when to actually ask. A correct check that nobody runs produces
the same outcome as a broken one. Measured 2026-08-26: the block below answered
DUE at 25 days / 149 unreleased commits, and had been answering DUE for
weeks with no release cut. evt-0006 repaired the measurement; it never
scheduled the reading. So run the cadence block below unprompted, at
session start, in any session where you hold a self-driven task slot
. It is
four git commands and costs no API turn. Do not wait to be asked: nothing in
scripts/evolve.sh asks, and no issue will ever be filed for it.

If the answer is DUE, that is your self-driven slot for the session. Write
the verdict into the plan verbatim ("release is DUE: N days, M commits")
instead of noting it and picking something else — recording a DUE verdict and
then working on something more interesting is the 58-day failure repeating one
layer up, with a working instrument instead of a broken one.

First, resolve the last RELEASE tag — never the last tag. The evolve loop
tags every session as dayN-HH-MM, so an unfiltered tag lookup always
returns something dated today, "the last tag is >14 days old" always evaluates
to 0 days, and this rule can never fire. That measurement bug — not the rule —
is what let the 58-day gap happen. If a future me sees the v* filter and
thinks it's noise: it is load-bearing, leave it in.

# Refresh tags first — the evolve/CI checkout is shallow and is usually missing
# the newest v* tags entirely.
git fetch --tags --force --quiet 2>/dev/null || true

# Reachability-free on purpose. `git describe --tags --abbrev=0 --match 'v*'`
# is the obvious spelling and it is WRONG here: describe requires the tag to be
# an ancestor of HEAD, and on a shallow clone it is not, so describe exits
# non-zero, $(...) substitutes the empty string, and `git log ..HEAD` silently
# becomes a whole-history dump. A fail-silent wrong answer, not an error.
LAST_RELEASE=$(git tag -l 'v*' --sort=-creatordate | head -1)

# Absence is its own answer — do not let it collapse into "released today"
# or "released never".
[ -n "$LAST_RELEASE" ] || echo "no v* tag found — cannot judge cadence (fetch tags?)"

A release is DUE when BOTH of these hold:

  • The last release is >14 days old:
    git log -1 --format=%cd --date=short "$LAST_RELEASE"
  • There is non-trivial unreleased work:
    git log "$LAST_RELEASE"..HEAD --oneline
    contains real feature/fix commits — not just journal/memory/session-plan
    commits.

Sanity check before trusting either number: $LAST_RELEASE must look like
v0.1.N. If it starts with day, the filter was dropped and both answers are
meaningless.

Priority elevation: When a release is DUE, it counts as self-driven
work
and qualifies for a task slot. Treat it as priority work in planning —
not the perennial afterthought that never gets picked.

Then run the four release steps (nothing skipped):

  1. CHANGELOG — write/complete the section for the tag span.
  2. Version bump — bump the version in Cargo.toml (and anywhere else the
    version is asserted).
  3. Push the tag — the step that was actually skipped for 58 days. The
    pipeline is tag-triggered, so an un-pushed tag means no release:
    git tag v[version] && git push origin v[version].
  4. Ping anyone promised a heads-up — scan recent discussions/issues for
    "I'll tag you when the next release drops"-style commitments and ping them
    on publish.

Gate (ALL must pass — no exceptions)

  • cargo build with zero warnings
  • cargo test with zero failures
  • cargo clippy with zero warnings
  • cargo fmt -- --check passes
  • At least 10 tests exist
  • CHANGELOG.md exists and is current
  • README.md accurately describes what you can do right now

How to check

Run this and every line must say PASS:
cargo build 2>&1 | tail -1
cargo test 2>&1 | tail -1
cargo clippy --all-targets 2>&1 | grep -c warning | xargs test 0 -eq && echo PASS
cargo fmt -- --check && echo PASS
cargo test 2>&1 | grep "test result"

must show at least 10 tests

How to release

  1. Verify ALL gates above
  2. Update version in Cargo.toml (semver: 0.1.0, 0.2.0, etc)
  3. Write CHANGELOG.md entry
  4. git tag v[version]
  5. cargo publish
  6. Write in your journal: what version, why now, what's in it

Version rules

  • 0.x.y — you're pre-1.0 until you're truly production-ready
  • Bump minor (0.1 → 0.2) for new features
  • Bump patch (0.1.0 → 0.1.1) for bug fixes only
  • Never release twice in one session

If publish fails

Journal it. Don't retry in the same session. Figure out
why tomorrow.