"Apply deterministic engineering checks to make Gerber, drill, and manufacturing outputs traceable to the exact board revision and generation settings."
Install
npx skillscat add lucas-belucci-bellini/all-skills-for-the-claude-code/radar-gerber-generation-provenance Install via the SkillsCat registry.
Radar Gerber Generation Provenance
Purpose
Make Gerber, drill, and manufacturing outputs traceable to the exact board revision and generation settings. This workflow turns the concern into a traceable engineering contract for the AERIS-10 project, while keeping simulations, software behavior, and physical measurements clearly distinguished.
Required inputs
Inspect 4_7_Production Files, PCB exporter settings, and manufacturing release manifest. Gather the authoritative interface/schema, the selected board or bitstream revision, existing tests, and the expected result. Prefer synthetic input vectors, simulator outputs, host mocks, and de-energized design inspection.
Workflow
- Trace 4_7_Production Files, PCB exporter settings, and manufacturing release manifest and record source paths, board/design revision, input/output ownership, and the existing validation entry points.
- Define pass/fail invariants for make gerber, drill, and manufacturing outputs traceable to the exact board revision and generation settings.; explicitly document units, widths, timing assumptions, safe defaults, and unsupported states where relevant.
- Exercise Changed board after export, missing layer, unexpected coordinate units, and stale file hashes with deterministic simulation or mocked hardware. Include normal, boundary, malformed, reset/cancellation, and failure cases without relying on uncontrolled physical targets.
- Produce A manufacturing-output manifest with a reproducible export checklist. Run the narrow test and relevant regression suite, capture actual outputs, and separate verified findings from assumptions requiring qualified hardware review.
Validation checklist
- The requirement is represented as an explicit, repeatable assertion or review criterion.
- Boundary values and at least one injected failure are included.
- Units, revision, data origin, and interface timing are stated where they change interpretation.
- Test results cite the exact command/tool run and repository revision.
- Simulation/mock evidence is not misrepresented as hardware measurement or certification.
- RF, power, motion, or external-interface tests stop when the approved safety envelope is unknown or violated.
Required output
Deliver A manufacturing-output manifest with a reproducible export checklist. Attach the paths reviewed, fixture or simulation identifiers, test commands and observed results, unresolved safety/compliance questions, and a clear distinction between code-level evidence and physical verification still required.
Boundaries and failure handling
Use synthetic inputs, host tests, simulation, or de-energized inspection wherever possible. Physical RF or powered hardware work requires qualified supervision, an approved lab procedure, regional compliance review, and functioning safety/thermal interlocks. Do not bypass an interlock, increase transmitter power or range as an objective, or turn signal-processing workflows into instructions for targeting people. If the design revision, emissions permission, termination, cooling, or measurement setup is uncertain, stop and document the blocker.
Trigger examples
- Positive: A maintainer needs to make Gerber, drill, and manufacturing outputs traceable to the exact board revision and generation settings..
- Negative: Publishing generated outputs as current after the source layout changed.