AFlow Handoff Plan

Create a generic, self-contained implementation plan organized into durable checkpoints. Plan only; do not implement.

Storage and evidence hygiene

  • For heavy work, specify owned output locations: named scratch/artifact directories, incremental build/test cache reuse, and bounded retention for scratch and proof.
  • State the peak additional allocation and the capacity reserve the work needs. Evidence-backed conservative estimates are acceptable where the plan permits; do not demand an exact measurement of an unbuilt output as a circular prerequisite.
  • Never present generic reference numbers as measured exact inputs; label each estimate and its basis.
  • Distinguish allocated (sparse) size from apparent size, and guest storage from host backing storage. Account for concurrent consumers of the same backing space.
  • Put targeted capacity checks in the checkpoints that perform heavy writes, and keep a single once-per-valid-state full gate in Final Verification; do not duplicate broad suites across checkpoints.
  • Specify cleanup: which owned disposable intermediates may be removed, and which unique data, images, models, session history, lineage, and failure proofs must be retained until diagnosed or explicitly released.
  • Prefer bounding verbose logs and captures at production over deleting the sole proof afterward.

Core Behavior

  • Treat prompt-supplied scope and plan paths as authoritative. If the target is ambiguous, ask.
  • Ask only the questions needed to resolve behavior, constraints, tradeoffs, dependencies, and acceptance criteria.
  • Confirm risky assumptions and record safe defaults explicitly.
  • Inspect the repository, applicable AGENTS.md files, existing architecture, tests, and documentation before finalizing.
  • Make the plan decision complete: a fresh worker must not need prior chat or need to choose behavior, precedence, fallback, validation, ownership, or verification strategy.
  • Make the plan self-sufficient; do not rely on another skill or workflow role to supply missing implementation guidance.
  • Keep the generated plan execution-model agnostic and worker-facing. Do not add manager selection, retry or upgrade routing, repair-overlay policy, workflow transitions, or review protocol.
  • Use repo-relative or execution-root-safe paths and commands. Never hardcode a guessed primary checkout path for repository-local work.
  • Use absolute paths only for external artifacts explicitly supplied by the user or environment and not mirrored in the repository.
  • Keep the original handoff plan as the durable progress ledger.
  • Use aflow as the canonical spelling.
  • Keep executable checkpoint task lists limited to agent-owned implementation and verification. Put genuinely user-owned checks after all checkpoint sections under a top-level ## User Acceptance Pending heading, using prose or ordinary bullets rather than task-list syntax.

Planning Workflow

  1. Resolve the requested outcome, exclusions, preserved behavior, assumptions, and acceptance criteria.
  2. Map affected components, interfaces, dependencies, risks, tests, generated artifacts, and documentation.
  3. Decide cross-cutting invariants and forbidden shortcuts.
  4. Draft checkpoints in dependency order.
  5. Audit every checkpoint for semantic cohesion, size, independent verifiability, and decision completeness.
  6. Re-audit the entire remaining plan after any checkpoint is split, merged, reordered, or materially revised.
  7. Persist the final plan under plans/in-progress/.

Checkpoint Shaping

  • Size checkpoints by reviewable change surface, not feature theme, bullet count, or total checkpoint count.
  • Prefer one coherent outcome spanning no more than two tightly coupled production layers. This is a heuristic, not a quota.
  • Split independently deliverable persistence or migrations, domain/state logic, concurrency or security boundaries, API/contracts, UI, external-tool integration, and build/deployment work.
  • Treat multiple stateful, security-sensitive, generated-contract, or external-process boundaries as complexity even when the projected diff is small.
  • Use file and line estimates only as secondary scope-pressure signals. Estimate maintained production code separately from tests, documentation, generated files, and vendored output; generated volume alone must not force a split.
  • Split whenever a subset can be implemented, verified, and accepted without the rest, or when one worker would need to coordinate several unrelated implementation threads.
  • When uncertain, choose the smallest stable dependency seam that preserves the agreed outcome and ordering.
  • After shaping, confirm every checkpoint has a narrow outcome, bounded scope, explicit dependencies, observable completion criteria, and proportionate verification.

Required Plan Content

Include these sections in substance, adapting headings when that improves clarity:

Summary, Git Tracking, Done Means, Critical Invariants,
Forbidden Implementations, Checkpoints, Final Verification,
Behavioral Acceptance Tests, Plan-to-Verification Matrix, and
Assumptions And Defaults.

Keep the content concise. Omit repetition, background already captured elsewhere in the plan, and instructions owned by execution or review tooling.

Output Contract

  • Use Markdown task lists (- [ ]) for checkpoints and meaningful agent-owned implementation or verification steps only.
  • Define project-level and checkpoint-level completion as observable behavior.
  • Make each checkpoint independently implementable and verifiable.
  • State exact behavior, interfaces, defaults, precedence, validation, error handling, and preserved compatibility where relevant.
  • Include context bootstrapping commands, allowed and excluded scope, dependencies, exact verification commands, and documentation impact.
  • Give each checkpoint exact commands and expected results for new or directly affected behavior, including focused non-regression checks. Keep required browser and visual checks for affected UI across the Chromium/WebKit and desktop/mobile cases named by project guidance.
  • Add a top-level ## Final Verification section outside checkpoint task lists. Specify exact commands and expected results for the complete cumulative regression set, including build, integration, or browser checks where applicable. State who executes this gate and when. Do not count an unspecified future CI run as the local final gate.
  • Put a broad suite in checkpoint verification only when a documented concrete shared-fixture or integration risk needs it there, or when the selected workflow has no cumulative final-review gate. In the latter case, assign the complete required coverage to a checkpoint before approval and record that coverage in Final Verification. Never silently move or omit an explicit check in an existing plan.
  • Name plausible harmful shortcuts in Forbidden Implementations.
  • Express behavioral acceptance tests as inputs and observable outcomes, not only test commands.
  • Map every important requirement to at least one concrete verification method.
  • Keep progress durable: checkboxes must represent verified work rather than activity.
  • If owner-only checks remain, append a top-level ## User Acceptance Pending section after Checkpoints. Use prose or ordinary bullets, and name the owner, prerequisites, exact action, expected result, and pending status for each item.
  • Define Done Means as implementation delivery and user acceptance reported separately. Pending user checks alone do not fail implementation or review or trigger a worker retry; implementation defects, required automated failures, and explicit release or approval gates still block the applicable outcome.
  • Final handoffs must list pending user checks and never claim full acceptance without evidence; do not invent or waive an explicit user-required gate.
  • Include only the minimal Git Tracking fields shown below; the runtime populates them.

For new plans, use the exact unnumbered level-two heading ## Git Tracking with the
controller-owned Plan Branch and Pre-Handoff Base HEAD fields below. Existing plans
with one narrow integer-dot prefix, such as ## 3. Git Tracking, remain supported so
their bytes do not need to be rewritten; never add a duplicate tracking section.

## Git Tracking

- Plan Branch: ``
- Pre-Handoff Base HEAD: ``

Use this checkpoint skeleton:

### [ ] Checkpoint N: <narrow outcome>

**Goal:**

- <one coherent implementation outcome>

**Context:**

- Run: `git rev-parse --show-toplevel`
- Inspect: `<repo-relative files or commands>`
- Preserve: <existing behavior or contract>

**Scope:**

- May create or modify: <files/components>
- Must not touch: <files/systems>
- Constraints: <decisions, interfaces, anti-shortcuts>

**Steps:**

- [ ] <decision-complete implementation step>
- [ ] <decision-complete implementation step>

**Dependencies:**

- <prior checkpoint, external prerequisite, or none>

**Verification:**

- Run: `<exact scoped command>`
- Run: `<exact non-regression or integration command>`
- Observe: <expected behavior>

**Done When:**

- <observable completion condition>
- Every completed step is validated against code, tests, or observable behavior.
- Verification passes and the changed files remain within scope.
- Before handoff, run `git status --short`, `git diff --name-only`, and `git diff --stat`.

**Blockers:**

- Stop and report if <genuine unresolved product, safety, ownership, or environment ambiguity>.
- Stop and report if unrelated dirty files make change ownership ambiguous.

When owner-only checks remain, append this after the last checkpoint section:

## User Acceptance Pending

- Owner: product owner; prerequisites: reviewed implementation is available on a physical/mobile device; action: open the changed screen and exercise the named flow; expected result: the documented behavior works; status: pending until the owner records evidence.

Global Guidance

Critical Invariants

Use concrete, testable rules that must hold across all checkpoints. Include only invariants whose violation would materially change the implementation.

Forbidden Implementations

Name shortcuts that are plausible and harmful, such as retaining two competing config sources, silently falling back to a local absolute path, bypassing validation, or describing future behavior as already implemented.

Acceptance And Verification

  • Include negative and failure-path coverage where behavior depends on rejection, recovery, security, or concurrency.
  • Separate focused checkpoint verification from the complete cumulative regression set under ## Final Verification. Name exact commands, working directories when needed, and observable passing outcomes for both phases. If broad checkpoint coverage is necessary, state the concrete risk.

Documentation

  • Update ARCHITECTURE.md when structure, boundaries, responsibilities, data flow, or integration contracts change.
  • Update DEVLOG.md when the project records notable implementation decisions, migrations, behavior changes, or operational follow-ups there.
  • Update nested AGENTS.md only when local agent instructions or directory responsibilities change; do not modify the root AGENTS.md.
  • Update existing user-facing documentation when setup, configuration, workflows, flags, behavior, or troubleshooting changes.
  • Update an existing relevant README section when one exists; do not invent unrelated README coverage.
  • Keep documentation aligned with behavior implemented in the same handoff. If a document needs no change, state why.

Assumptions And Defaults

Record safe defaults and their basis. Ask instead of defaulting when a choice would materially change behavior, compatibility, security, or scope.

Plan Persistence

  1. Ensure plans/in-progress/ exists in the execution repository.
  2. Save the original plan there with a descriptive Markdown filename.
  3. Do not overwrite a prior-session file; add a version or date suffix. A file created in the current session may be corrected in place.
  4. Leave the original plan in plans/in-progress/ after all checkpoints are complete; the workflow engine owns the final move to plans/done/.