Governance Check

Two kinds of rule govern Compass, and the governance check is the
moment they are applied to a plan, spec, or change. It is not one pass/fail
against one document - it is three distinct walks against three
distinct files in governance/, and each has its own standard of proof.

  • guardrails.md - hard, checkable, blocking. A guardrail is cleared with
    evidence; a failed guardrail stops the work. A guardrail beats a strategy.
  • strategies.md - soft, assessed, accretive. A strategy is judged, not
    cleared; following it is the default, departing from it is allowed and
    recorded
    . A strategy never stops the work on its own.
  • routing-policy.md - the same split applied to the router: routing
    guardrails
    bound the delivery approach, routing strategies bias it.

Read governance/ fresh before you start. A guardrail or strategy can
change between sessions, and a cached memory of an earlier read is not the
current file.

Record which governance you read. governance/guardrails.yml and
governance/routing-policy.yml each declare a version:, and
tests/fixtures/governance-content-hashes.json pins their content. Write both
version numbers into the check, the way the technical-design template's
policy-provenance section does. A check that names no version cannot be told
apart from one run against wording that has since changed, and the prose
files carry no version of their own to compare.

Before you start

Read the current governance/ files at the project root, and note the
version: each of the two YAML files declares. If /compass:init
has not been run, the framework's shipped
governance/ defaults apply as-is - and that is a valid, complete governance
state, not a missing prerequisite. The shipped defaults alone are a
complete governance state
: "the shipped default guardrails, the shipped default strategies,
and zero project additions" is a fully legitimate thing to check against. Do
not treat an un-extended governance/ as a reason to stop.

If the project has governance/decisions/, read it too. Each entry records a
product decision a named person made, and never changes. A design that
reverses one is reported as "settled by ", for the person to reopen
with a new entry, not passed or failed on your judgement.

Walk 1 - the guardrails (hard, evidence)

Walk the plan, spec, or change against every applicable guardrail - the five
shipped defaults and any project guardrails.

The five default guardrails:

  • Tested before it lands. Is the work shaped so that nothing reaches
    main without a passing automated test it traces to? At Plan, this means the
    plan introduces work test-first (the TDD strategy is how) and the test
    surface is planned. At the verify stage, it is cleared with the recorded run.
  • Acceptance defined before it is built. Does every piece of planned
    code trace to a stated, checkable acceptance criterion that exists before
    the code? The BDD strategy (Given/When/Then scenarios) is the default way to
    satisfy this; the guardrail itself is the outcome - acceptance is stated and checkable.
  • Traceability holds. Are both chains planned for and intact -
    code → acceptance criterion → intent, and public claim → backing criterion?
  • Evidence, not assertion. This one is about the others: a guardrail
    is cleared with artifacts and command output, never a claim. When you record
    a guardrail result, the proof is the artifact.
  • A human signs off on the irreversible. Does anything that can lose
    data, move money, or breach auth or privacy have an explicit human checkpoint
    before it lands? Check the plan routes such work to where the checkpoint
    happens.

Then any project guardrails - concrete, measurable floors a project has added
(a coverage floor, a no-secrets-committed rule, a tested-rollback rule). Floors
only ratchet up: a plan can exceed a floor, never fall short of one.

The standard of proof is evidence. At Plan you are checking the plan is
shaped to clear each guardrail; at the verify stage the guardrail is cleared with the
verifier's artifacts. Either way: "looks fine" is not a result. For each
guardrail, record clears (with the evidence, or the plan element that will
produce it) or fails (with the specific guardrail and how it is crossed). A
plan that crosses a guardrail does not proceed - it is revised, or the issue
is re-assessed. There is nothing to waive a guardrail for; a guardrail beats every
strategy and every convenience.

Walk 2 - the strategies (soft, assessed)

Walk the same plan, spec, or change against the applicable strategies - the
shipped default method strategies (including BDD and TDD) and any
project strategies (product, engineering, voice & positioning).

The standard here is different and you must keep it different. A strategy is
assessed, not cleared:

  • Did the work follow the strategy? This is honest judgement - is this the
    simplest thing that works, does it follow the team's engineering
    strategies, does the copy fit the voice strategies.
  • Where it departed from a strategy, is the departure recorded? A recorded
    departure is the system working, not a failure. An unrecorded departure is
    the thing to flag - not because the departure is wrong, but because it was
    silent.
  • Record the result as judgement, clearly labelled as judgement - never
    dressed up as evidence. A strategy not followed is a note and a conversation,
    not an automatic stop.

The no-placeholders check

Before committing technical-design.md, run:

compass plan lint

It reports phrases that mean the plan is not actually finished - TBD, TODO,
"implement later", "add appropriate error handling" - and work units that
promise tests without naming any. These are the most common form of plan failure
in practice: not a wrong decision, but a decision quietly deferred to whoever
builds it, who then makes it alone and unrecorded.

It belongs in this walk because a reported hit is a note, rather than a
stop
. The command always exits 0 - the shell's success code, whatever it
reports. Assess each hit as judgement: either fill the gap in, or record why
the placeholder legitimately stands (a genuinely deferred decision with a
named owner is a plan, an unowned TBD is a gap). It never blocks the plan stage on any
delivery approach, and no floor promotes it to a gate.

Two things it deliberately does not do. It ignores text inside fenced code
blocks (the triple-backtick kind) and blockquotes (lines opening with >),
because every document explaining the check has to quote the phrases it looks
for. And it does not judge softer patterns - a work unit described only as
"similar to the one above", or an approach section that restates the spec
without saying how. Those need reading, which is your job in this walk, not
the command's.

Two of the default strategies are approach-aware: BDD and TDD
are suspended on a spike. If you are checking a Spike, do not flag the
absence of scenarios or red-before-green as a strategy failure - that
suspension is the delivery approach working as designed.

Walk 3 - the routing policy

Confirm the plan is consistent with routing-policy.md:

  • Routing guardrails - did every floor that should have fired, fire? Is the
    delivery approach the plan assumes consistent with the caps (e.g. the worktree cap on
    critical risk)? Are the immovable_gates and blocking role_rules
    reflected in the plan's gate set and artifact list? A plan that quietly
    assumes a lighter delivery approach than the routing guardrails allow fails here.
  • Routing strategies - did the delivery approach follow the default shapes and biases,
    or is a departure recorded in delivery-approach.md? A recorded departure is fine; a
    silent one is the flag.

How to run the check (plan stage)

  1. Read the current governance/ files.
  2. Walk 1 - guardrails - against technical-design.md and the spec it builds on. Record
    per guardrail: clears (with evidence or the plan element that produces
    it) or fails (with the specific guardrail).
  3. Walk 2 - strategies - against the same. Record per strategy as judgement:
    followed, or departed-and-recorded, or departed-silently (flag it).
  4. Walk 3 - routing policy - confirm the plan's assumed delivery approach is within the
    routing guardrails and consistent with the routing strategies.
  5. Write all three results into technical-design.md, with the guardrail findings and the
    strategy assessment visibly separate - evidence on one side, judgement
    on the other.
  6. A failed guardrail stops the plan - revise or re-assess. A strategy
    departure does not stop the plan; record it and, if it matters, raise it.
    That asymmetry is the whole point of the split.
  7. If a guardrail itself seems wrong, that is an amendment conversation
    (change guardrails.md, bump guardrails.yml's version: field, and say
    why in the commit message) - never a quiet override mid-issue. If a
    strategy keeps getting overridden the same way, that is a curation signal -
    fix the strategy or write down the thing overriding it.

Anti-patterns

  • The one-line pass - "governance check: pass" with no per-guardrail,
    per-strategy detail. If you cannot name what you checked, you did not check.
  • Conflating the two walks - clearing a guardrail on judgement, or treating
    a strategy departure as a hard stop. The standards of proof are different on
    purpose; collapsing them is the failure the strategies/guardrails split was
    built to prevent.
  • The dressed-up strategy - recording a strategy assessment as if it were
    evidence-backed. It is judgement; label it.
  • The convenience override - treating a guardrail as advisory because
    honouring it is inconvenient. A guardrail beats every strategy and every
    deadline; inconvenience is not a counter-argument.
  • Checking the stale file - reviewing against a remembered copy of
    governance/ instead of reading it fresh, so the check runs against
    wording that has since changed. Recording both version: values makes this
    visible to a later reader instead of invisible.
  • Floor erosion - reading a project guardrail floor as a target to hit
    rather than a minimum to clear. Floors only ratchet up.
  • Silent delivery-approach assumption - a plan that assumes a lighter
    delivery approach than the
    routing guardrails permit, without anyone noticing the policy was bypassed.
  • Treating an un-extended governance/ as broken - the shipped defaults
    alone are a complete governance state; check against whatever is