Plans Azure DevOps Product Backlog Items for the agent team - reads PBIs tagged agent-plan (or a given PBI id), has the planner agent break each into tasks, and creates them as child Tasks tagged agent-proposed for the product owner to approve. Use when the user says plan the backlog, plan PBI 123, break down this item, or similar.

GitQuuu 0 Actualitzat fa 1 d
GitHub

Instal·la

npx skillscat add gitquuu/qugents/ado-plan

Instal·la des del registre de SkillsCat.

SKILL.md

Plan backlog items into agent tasks

Load the ado-backlog skill first: it has the project settings, tools, fields, tags and WIQL. This skill runs in the main session (it talks to Azure DevOps); the planning itself is done by the qugents:planner agent.

Input: a PBI id (/qugents:ado-plan 123) or nothing, which means every PBI tagged agent-plan.

Steps per PBI

  1. Read. wit_work_item get with relations: title, description, acceptance criteria, tags, parent Feature/Epic (read its title/description for context), existing child Tasks, and list_comments (the PO may have answered earlier questions there).
  2. Check readiness. If acceptance criteria are missing or the item is too vague to plan, do not invent them: add a comment with 1–5 concrete questions, add tag needs-human, and move to the next PBI.
  3. Plan. Spawn qugents:planner with: the PBI title, description and acceptance criteria verbatim; the parent's goal; the PO's comments; the existing child tasks (plan only the gap); and the instruction "Output tasks in your standard format. Each task must be one pull request."
  4. Create tasks. One wit_work_item_write add_child call under the PBI with all tasks in order (workItemType: "Task", format: "Markdown"):
    • Title: T<n> — <imperative title>
    • Description (Markdown): Why, Acceptance criteria (Given/When/Then list), Backend, API contract, Frontend, Test cases, Depends on. Keep the planner's content as it is.
      Then one update_batch on the new ids: /fields/System.Tags = agent-proposed and /fields/Microsoft.VSTS.Scheduling.RemainingWork = 2 (S), 4 (M) or 8 (L). add_child cannot set these itself.
  5. Link dependencies. For "Depends on: T", link the new task to T as successor/predecessor.
  6. Update the PBI. Tags: remove agent-plan, add agent-planned. Comment:
Agent plan: <n> tasks created (T1–T<n>), tagged agent-proposed.
Next step (PO): review/edit the tasks and change agent-proposed → agent-ready on the ones to build.
Open questions: <planner's open questions, or "none">
Risks: <planner's risks, or "none">

If the planner has open questions that block a task, still create the other tasks, and tag the PBI needs-human as well.

Rules

  • Never tag anything agent-ready. That is the PO's approval.
  • Never edit the PBI's description, acceptance criteria or state.
  • Re-running on a PBI that already has agent-planned only adds tasks for new scope the PO asked for in a comment; it never duplicates existing tasks.
  • Finish with a short summary to the user: PBIs planned, tasks created (ids + titles), questions raised.